Intersection of Spring Court and Arthur Drive to top of embankment on the south
Developer/Owner:Owner: Various / Construction Coordinator: City of Fort Collins
URA funding:$71,000
Total cost:TBD
Plan and design the extension of the trail across the Sherwood Lateral from Spring Court and over bluff (with easement acquisition) to Whole Foods.
FAQs
Design is 30% complete. The project will be advanced toward completion when funding is identified.
North/South circulation through this area has been difficult, with no way through except a narrow sidewalk on College Avenue. This creates a gateway between two commercial areas and invites pedestrian and bike circulation in a much safer corridor.
Access through the area will allow development and improvement for local businesses. The rendering illustrates the possibilities for this project.
Project details
In Progress
Intersection of Spring Court and Arthur Drive to top of embankment on the south
Developer/Owner:Owner: Various / Construction Coordinator: City of Fort Collins