Sherwood Lateral Crossing

Project details

In ProgressIn Progress
Intersection of Spring Court and Arthur Drive to top of embankment on the south
Developer/Owner: Owner: Various / Construction Coordinator: City of Fort Collins
URA funding: $71,000
Total cost: TBD
Graphic map of Prospect South Plan Area with a location pin marking the Sherwood Lateral Crossing Project at the Intersection of Spring Court and Arthur Drive to top of embankment on the south.

Plan and design the extension of the trail across the Sherwood Lateral from Spring Court and over bluff (with easement acquisition) to Whole Foods.

    FAQs

    • Design is 30% complete. The project will be advanced toward completion when funding is identified.

    • North/South circulation through this area has been difficult, with no way through except a narrow sidewalk on College Avenue. This creates a gateway between two commercial areas and invites pedestrian and bike circulation in a much safer corridor.

    • Access through the area will allow development and improvement for local businesses. The rendering illustrates the possibilities for this project.

    Project details

    In ProgressIn Progress
    Intersection of Spring Court and Arthur Drive to top of embankment on the south
    Developer/Owner: Owner: Various / Construction Coordinator: City of Fort Collins
    URA funding: $71,000
    Total cost: TBD
    Graphic map of Prospect South Plan Area with a location pin marking the Sherwood Lateral Crossing Project at the Intersection of Spring Court and Arthur Drive to top of embankment on the south.