Bike and Pedestrian Infrastructure

Project details

In ProgressIn Progress
Between College and the Railroad Tracks from Prospect south to the Sherwood Lateral Ditch
Developer/Owner: Owner: Various / Design Coordinator: City of Fort Collins Engineering, Parks, FC Moves, and URA
URA funding: $127,122
Total cost: TBD
Graphic map of Prospect South Plan Area with a location pin marking the Bike and Pedestrian Circulation Project, between College and the Railroad Tracks from Prospect south to the Sherwood Lateral Ditch.

The Prospect South Area has long had poor safety and circulation for bikes and pedestrians. This can be seen by the sometimes narrow and non-existent sidewalks along the west side of College Avenue, and the poorly aligned walkway through the center of the area. This was determined to be the area’s highest priority through a citizen input process completed in 2021.

An effort to gather information from the community members, businesses and City and CSU professionals was started in 2025 and completed in 2026. This process identified 27 potential projects to improve circulation and public spaces throughout the area. Five projects with the highest priority were selected to take to 30% design. They include Prospect Crossing, The State Parking Lot on College, Sherwood Lateral Crossing, District-wide Lighting, and District-Wide Curb Stops. Other projects not listed here will advance in the future as funding becomes available. A detailed description of these projects can be obtained from the Fort Collins URA.

The five projects listed above are broken out individually, but additional projects are expected to come from the process described above. The next part of the work in this area will be identifying funding sources and moving the projects to completion.

    FAQs

    • Initial design work is completed on the five highest priority projects. Construction will begin starting in 2027 and be done over the next ten years or more as funding is available.

    • Work with citizens, business owners and engineering professionals has identified this area as needing improvement of circulation and safety measures for bicycle riders and pedestrians. Creation or improvement of public spaces was also identified as a need for this area. In eliminating and preventing blight in the Prospect South area.

    • The ability to move through this area will be improved through fixing some circulation problems along College and Prospect Avenues. It will also create a way to move safely north and south through the center of the area.

    Project details

    In ProgressIn Progress
    Between College and the Railroad Tracks from Prospect south to the Sherwood Lateral Ditch
    Developer/Owner: Owner: Various / Design Coordinator: City of Fort Collins Engineering, Parks, FC Moves, and URA
    URA funding: $127,122
    Total cost: TBD
    Graphic map of Prospect South Plan Area with a location pin marking the Bike and Pedestrian Circulation Project, between College and the Railroad Tracks from Prospect south to the Sherwood Lateral Ditch.