Between College and the Railroad Tracks from Prospect south to the Sherwood Lateral Ditch
Developer/Owner:Owner: Various
URA funding:$23,000
Total cost:TBD
Master plan and install a branded pedestrian scale lighting throughout the district to improve the comfort and security of the walking and bicycling experience at night.
FAQs
Design is 30% complete. The project will be advanced toward completion when funding is identified.
Safety.
Installation throughout the area of pedestrian-scale lighting.
Project details
In Progress
Between College and the Railroad Tracks from Prospect south to the Sherwood Lateral Ditch