District Wide Curb Stops

Project details

In ProgressIn Progress
Parking lots within the Prospect South TIF Area
Developer/Owner: Owner: Various
URA funding: $2,000
Total cost: TBD
Graphic map of Prospect South Plan Area with a location pin marking the District-Wide Curb Stops Project in parking lots within the Prospect South TIF Area

Install curb stops in parking areas adjacent to the trail to prevent cars from over parking the trail throughout the district.

    FAQs

    • Design is 30% complete. The project will be advanced toward completion when funding is identified.

    • A problem property with a high number of Police and Fire calls was creating and promoting blight in the area. Purchase and resale of a property that did not have a positive outlook for reuse in the near future because of high on-site contamination levels was approved as a good use of URA funds.

    • A blighted and nuisance building and the associated issues that come with that will be removed and replaced with a use with a positive impact on the neighborhood.

    Project details

    In ProgressIn Progress
    Parking lots within the Prospect South TIF Area
    Developer/Owner: Owner: Various
    URA funding: $2,000
    Total cost: TBD
    Graphic map of Prospect South Plan Area with a location pin marking the District-Wide Curb Stops Project in parking lots within the Prospect South TIF Area