Northeast College Corridor Outfall Stormwater Improvements

Project details

CompletedCompleted
North of Conifer Street
Developer/Owner: Owner: The City of Fort Collins / Developer: City of Fort Collins Stormwater
URA funding: $326,472
Total cost: $1,222,934
Graphic map of North College Plan Area with a location pin marking the NECCO Storm Water Improvements Project, North of Conifer Street.

The infrastructure includes three main components:

  • A unified regional stormwater and water quality system designed to serve the area north and east of the NECCO regional detention pond;
  • A regional detention pond located just west of Redwood Drive; and
  • The outfall pipe connects the pond to the East Vine Diversion channel (located east of Lemay Avenue).

The regional detention pond and the outfall pipe connecting to the East Vine Diversion channel constitute the infrastructure known as the “backbone” of NECCO. This is the essential infrastructure required to allow the unified regional stormwater and water quality system to function properly

    Project details

    CompletedCompleted
    North of Conifer Street
    Developer/Owner: Owner: The City of Fort Collins / Developer: City of Fort Collins Stormwater
    URA funding: $326,472
    Total cost: $1,222,934
    Graphic map of North College Plan Area with a location pin marking the NECCO Storm Water Improvements Project, North of Conifer Street.