North College Streetscape

Project details

CompletedCompleted
North College Avenue from Vine Drive to Conifer Street
Developer/Owner: Owner: Public Right-of-way / Developer: City of Fort Collins Engineering
URA funding: $2,700,000
Total cost: $11,900,000 (City funding $9,200,00)
Graphic map of North College Plan Area with a location pin marking the North College Streetscape Project, spanning North College Avenue from Vine Drive to Conifer Street.

The North College Improvements Project goes from the existing Poudre River Bridge to the Conifer/Hickory intersection along both sides of the highway. Improvements will include a two inch asphalt overlay, the construction of various urban design elements, an eight foot on-street bike lane, a landscaped parkway, shared use paths, the definition and consolidation of accesses throughout the corridor, an updated storm system including water quality treatment ponds, and safety improvements at the Conifer/Hickory Intersection.

    Project details

    CompletedCompleted
    North College Avenue from Vine Drive to Conifer Street
    Developer/Owner: Owner: Public Right-of-way / Developer: City of Fort Collins Engineering
    URA funding: $2,700,000
    Total cost: $11,900,000 (City funding $9,200,00)
    Graphic map of North College Plan Area with a location pin marking the North College Streetscape Project, spanning North College Avenue from Vine Drive to Conifer Street.